LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
DAILY OPERATING PROCEDURES -- Continued
0010 00
DAILY OPERATING PROCEDURES -- Continued
A. System Start--up -- Continued
2
1
5
3
4
NOTE
If the water heating operation is stopped while in progress, OVERRIDE FILLING
should be selected when system is restarted. Selecting the FILL TANKS option will
result in excess water being added to the rinse 2 tank.
19. Press appropriate MENU SELECTION switch as follows:
a. Select MODIFY SETPOINT to change displayed setpoint in 5 degree increments until desired setpoint is
displayed.
b. Select HEAT WATER to heat water tanks. Proceed to step 20.
c. Select OVERRIDE HEATING to bypass water heating. Proceed to step B to load laundry.
20. Monitor display (7), it should read:
HEAT WATER
SETPNT= XXX F TEMP = XXX F
MODIFY SETPOINT
OVERRIDE HEATING
EXAMINE INPUTS
NOTE
It will take approximately 20--40 minutes for heat water operation to be completed.
21. Wait for water heating to be completed then proceed to step B to load laundry.