TM 10--3510--221--24
0215 00--3/4 blank
CPU PCB REPLACEMENT -- Continued
0215 00
INSTALLATION
1. ESD. Connect wire harness (8) to J4 connector (9) on new CPU PCB (4).
2. ESD. Connect wire harness (6) to J1 connector (7).
3. ESD. Slide CPU PCB (4) into card cage (5). Make sure PCB is fully seated.
4. ESD. Slide retaining plate (6) forward and tighten two screws (5).
5. Turn handle (10) CW, then close door (11).
6. Secure door (11) to main control enclosure (12) by tightening eleven latches (13).
7. Using maintenance menu calibrate levels sensors (LT100A through LT201), pressure sensors (PT200 through
PT501), and temperature sensors (TE100 through TE300) (WP 0010 00).
8. Perform DAILY START--UP and a test LAUNDRY CYCLE (TM 10--3510--221--10). Verify normal operation.
END OF WORK PACKAGE