TM 10-3510-222-10
Table 2-1. Preventive Maintenance Checks and Services - continued.
Location
Item No.
Interval
Procedure
Not Fully Mission Capable If:
Item to
Check/Service
26
Weekly
Washer Air Tank
a.
Make sure gage has at least
30 psi.
b.
Open drain cock to bleed
Washer air tank
condensation from air tank.
has water in it.
c.
Close drain cock.
2-33