PROCEDURE 1 COVERS:
Loss of power
INITIAL SETUP:
CSSL set up but not in operation
Maintenance Level
Materials/Parts
Unit
None
ARE MAIN CIRCUIT BREAKERS SET TO ON?
SET MAIN CIRCUIT BREAKERS TO ON
IS POWER SOURCE CONNECTED ?
HAVE QUALIFIED PERSONNELL (MOS
51R, 52C, 52D, OR 52G) CONNECT
100AMP POWER CABLE PIGTAIL END TO
INTENDED POWER SOURCE. ENSURE
100AMP POWER SUPPLY CABLE IS
CONNECTED TO CSSL POWER ENTRY
BOX CONNECTOR J1 OR J2
IS PHASE INDICATOR LIGHT ON ?
HAVE QUALIFIED PERSONNEL (MOS
51R, 52C, 52D, OR 52G) VERIFY THAT
100AMP, 208 VOLT, 3 PHASE POWER IS
BEING SUPPLIED. IF GENERATOR IS
USED, VERIFY ITS OUTPUT
ARE EQUIPMENT CIRCUIT BREAKERS SET TO
ON ?
SET INDIVIDUAL CIRCUIT BREAKERS TO
ON
NOTIFY DIRECT SUPPORT MAINTENANCE
NO
YES
NO
NO
NO
YES
YES
YES