TM 10-3530-207-14
5-29. CLOTHING SEWING MACHINE RECEPTACLE ASSEMBLY MAINTENANCE.
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Repair
e.
Installation
INITIAL SETUP :
Tools:
Equipment Condition:
General Mechanics Tool Kit (Appendix B,
Power removed (para. 2-18)
Item 1)
Table removed from stand (para. 2-18)
Materials/Parts:
Machine removed (para. 2-18)
Rag, wiping (Appendix F, Item 2)
Bobbin removed (para. 2-18)
Thread unwinder removed (para. 2-18)
Light assembly removed (para. 2-18)
Removal.
(1) Loosen four screws on both box cords
(1).
(2) Remove cover (2).
(3) Remove receptacle (3).
(4) Tag and disconnect wiring.
(5) Remove two wood screws (4) and
electrical box (5) from clothing table top.
(6) Remove box cords (1).
Cleaning.
(1) Wipe parts with a damp wiping rag
(Appendix F, Item 2).
(2) Allow to dry.
Inspection.
(1) Inspect hardware for damage.
(2) Inspect for broken or burnt wires.
(3) Inspect receptacle for damage.
(4) Inspect electrical box for damage.
5-71