SITING REQUIREMENTS
This section outlines the siting requirements of the CL, as well as the installation, preparation, and
operation of the latrine under usual conditions.
When the CL is deployed, it will be staked as part of Force Provider site preparation as described in TM
10-5419-206-13.
Site must be:
Easily defensible, as dictated by unit Standard Operating Procedure (SOP) .
Hardstand or other improved areas; however, any area that is level, free of large holes, trees,
debris; properly drained in event of bad weather, and within the guidelines of the unit Standard
Operating Procedure (SOP) is acceptable.
Positioned to allow unobstructed utility hookups (potable water, electrical, and black water) to CL.
Positioned to allow clearance for Waste Water Vacuum Tank/Trailer (WWVT/T) to service CL
through blackwater drain connection door.