TM 10-7360-226-13&P
0006 00
CONTAINERIZED KITCHEN (WITH TRAILER)
OPERATION UNDER USUAL CONDITIONS
the fabric and the arches. Orient each fixture so the end with the power cord is toward the
designated receptacle.
2. Plug the power cords into their marked receptacles on the ceiling raceway.
3. Tuck the excess cable between the fabric and the arches.
4. Place the two arch frame component bags and the packing blanket in the light storage box.
Store the box under the tables in the serving wing or in another convenient location as desired.
REMOVABLE
REMOVABLE
FIXTURES
FIXTURES
BLACKOUT LIGHTS
Figure 14. Ceiling Light Fixture Layout.
Water and Drain System Startup
The water supply hose, internal drain hose, and external drain hose should already be connected
as described earlier in this Work Package. Fill the water system as follows:
CAUTION
The switches for the water pump and water heater (located on the
appliance control box) must be left OFF until the water system and water
heater are filled. Energizing these items without water in them will result in
equipment damage.
In freezing weather, the water tank trailer should be located as close to the
fabric penetration as possible. Additional procedures to prevent freezing
1. Ensure that both drain valves in the sink assembly are fully closed. The valves are located at
the back of the assembly under the water heater one for the heater and one for the cold
water line. If necessary, unlock the sink assembly casters and temporarily move the sink
assembly to check the valves.
Change 2
0006 00-22