TM 10-7360-226-13&P
CONTAINERIZED KITCHEN (WITH TRAILER)
DIRECT SUPPORT MAINTENANCE PROCEDURES
SHELTER ASSEMBLY/MECHANICAL ROOM
THIS WORK PACKAGE COVERS:
Inspect, Repair
INITIAL SETUP
CK set up
Air conditioner removed (for air conditioner repair)
Maintenance Level
Direct Support
Tools and Special Tools
GENERAL
This procedure contains information and instructions to keep the shelter assembly and
mechanical room in good working order by inspecting and repairing its components and
subassemblies.
INSPECT
Inspect the following shelter assembly components for bent or cracked sheet metal, cracked
welds, and loose or missing rivets:
= Stairs
= Platform
= Railings
REPAIR
Shelter Assembly: Perform welding operations as described in TM 9-237, Operator's Manual:
Welding Theory and Application.
Replace loose or missing rivets and perform sheet metal repair as described in TM 9-510, Metal
Body Repair and Related Operations.
Air Conditioner:
Remove and Replace Evaporator Blower Motor: Remove the air conditioner top cover (see
Figure 1). Label and disconnect the evaporator blower motor wiring in the wire box. Slide the
wiring harness through the side wall. Remove the hardware from the side panel and remove
the evaporator blower assembly from the air conditioner.
Remove the four screws from the assembly cover and the three screws from the motor
mounting bracket. Remove the blower motor from the assembly cover. Remove the blower
wheel from the motor shaft.
0030 00-1