TM 55-1680-351-10
CHAPTER 2
OPERATING INSTRUCTIONS
Section I. PREPARATION
5.
Donning and Fitting of Vest
a.
Body armor is donned.
b.
LPU-10/P life preservers over body armor, underarm.
c.
Vest is donned and LPU-10/P life preservers are U pulled through
each arm pit opening to hang over vest, underarm.
d.
Personnel parachute is donned last and is adjusted to be as free
as possible from interference from components pockets on vests.
Change 3
2-1