ITEM
NO.
INTER-
VAL
MAN-
HOUR
ITEM TO
CHECK OR
SERVICE
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
Table 1. PMCS for AIRSAVE. - Continued
After
(Cont)
(Cont)
5
SRT
b. Check the bar tack
stitching where webbing
has been sewn together
to form the loop. There
should be 6 bar tacks. If
any of the bar tack stitches
have loosened or are
missing, replace the SRT.
Any bar tack is
missing or
stitching is loose.
c. Inspect SRT for
cleanliness. If SRT has
become soiled, clean as
indicated in WP 0009 00.