TM 1-4220-250-12&P
4.9.1
Packing the LRU-18/U Life Raft into the Container Assembly (Continued).
t.
Secure cover with the hook and pile fasteners and the two snap fasteners. Then snap the beaded inflation handle
to the four snap fasteners (shown unfastened).
u.
Safety tie beaded inflation handle with one loop of nylon thread (D19). Pull thread sufficiently to permit 1/2 + 1/8
inch space between the middle beads and webbing. Tie off ends with a surgeon's knot followed by a single
overhand knot.
v.
Complete DA Form 2408-21.
w.
Install DD Form 1574.
END OF TASK
4-36