TM 10-3510-208-12
OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B-BEFORE OPERATION
A-AFTER OPERATION
D-DURING OPERATION
PROCEDURES
EQUIPMENT IS
ITEM TO BE
Check for and have repaired
Not Ready/
INSPECTED
or adjusted as necessary
Available if:
TS 10-3510-208-12/3-2 (3 of 7)
Controls and
With unit operating, check
Instruments
the laundry unit instruments
and gages for the following
indications:
a.
Water heater
75 to 80 psig.
Fuel pressure
fuel pressure
cannot be properly
adjusted.
b. Water heater
150F 5 with water
Temperature gage
temperature
temperature select knob in
does not indicate
gage
#4 position
properly.
3-8
Change 2