TM 10-3510-208-12
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
W-WEEKLY (40 HOURS)
S-SEMIANNUAL (500 HOURS)
M-MONTHLY (100 HOURS)
H-HOURS (AS INDICATE D) -
PROCEDURES
EQUIPMENT IS
ITEM TO BE
Check for and have repaired
Not Ready/
INSPECTED
or adjusted as necessary
Available
if:
Control
Remove front covers and clean in-
boxes
terior of the washer extractor
and tumbler dryer control boxes.
Use care when cleaning to prevent
damage to components.
Fuel drums
Dump remaining fuel in fuel drums
Washer-
Check and adjust extractor washer
extractor
V Belts.
TS 10-3510-208-12/4-3 (11 of 15)
4-10.2
Change 2