TM 10-3510-222-24
Section III. SERVICE UPON RECEIPT
2-5. SERVICE UPON RECEIPT OF MATERIAL.
a.
Laundry Unit. Inspect Laundry Unit for damage incurred during shipment. If the equipment has been damaged,
report the damage on SF 364, Report of Discrepancy.
b.
Equipment. Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions in DA PAM 738-750 or DA PAM 738-751 as applicable.
c.
Trailer. Refer to TM 9-2330-376-14&P for service upon receipt of trailer.
d.
Generator. Refer to TM 5-6115-585-12 for service upon receipt of generator set.
e:
Water Heater. Refer to TM 10-4520-259-13&P for service upon receipt of water heater.
f.
Depreservation. Perform needed depreservation. Prepare Laundry Unit for inspection and operation as outlined
in DA Form 2258. Make a thorough visual inspection of the Laundry Unit for loose or missing mounting
hardware, parts and components.
g. Preventive Maintenance Checks and Services (PMCS). Perform the Before and Weekly preventive
maintenance checks and services. (Refer to TM 10-3510-222-10.)
h.
Lubrication Instructions. Lubricate the unit in accordance with LO 10-3510-222-12, Laundry Unit.
2-5