Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
CLOTHING SEWING MACHINE TIMING - continued - TM-10-3530-207-14_413
CLOTHING SEWING MACHINE RECEPTACLE ASSEMBLY MAINTENANCE - continued
TM-10-3530-207-14
Page Navigation
398
399
400
401
402
403
404
405
406
407
408
TM 10-3530-207-14
5-29. CLOTHING SEWING MACHINE RECEPTACLE ASSEMBLY MAINTENANCE.
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Repair
e.
Installation
INITIAL
SETUP
:
Tools:
Equipment Condition:
General Mechanics Tool Kit (Appendix B,
Power removed (para. 2-18)
Item 1)
Table removed from stand (para. 2-18)
Materials/Parts:
Machine removed (para. 2-18)
Rag, wiping (Appendix F, Item 2)
Bobbin removed (para. 2-18)
Thread unwinder removed (para. 2-18)
Light assembly removed (para. 2-18)
Removal
.
(1) Loosen four screws on both box cords
(1).
(2) Remove cover (2).
(3) Remove receptacle (3).
(4) Tag and disconnect wiring.
(5) Remove two wood screws (4) and
electrical box (5) from clothing table top.
(6) Remove box cords (1).
Cleaning
.
(1) Wipe parts with a damp wiping rag
(Appendix F, Item 2).
(2) Allow to dry.
Inspection
.
(1) Inspect hardware for damage.
(2) Inspect for broken or burnt wires.
(3) Inspect receptacle for damage.
(4) Inspect electrical box for damage.
5-71
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business