TM 10-3530-207-14
5-32. DARNING SEWING MACHINE NEEDLE BAR AND PRESSER BAR ASSEMBLY MAINTENANCE -
continued.
Installation.
(1) Install thread take-up lever (1) and driving stud (2) into connecting link (3).
(2) Install oil wick (4) into hinged stud (5).
(2) Install hinged stud (5) and setscrew (6). Ensure flat side is up so setscrew (6) will sit on flat Do
not place hinged stud (4) too deep into the thread take-up lever (1).
(3) Place thread take-up block (7) onto connecting link (3).
(4) Slide presser bar (8) over thread take-up block (7).
(5) Install bushing (9).
(6) Install setscrew (10). Ensure setscrew (10) is over groove in bushing (9).
5-88