Chapter 1 INTRODUCTION - TM-10-4510-201-140033Figure 1-1. Bath unit set up for operation.Tabulated Data - TM-10-4510-201-140035Figure 1-2. Bath unit instruction plate.Chapter 2 OPERATING INSTRUCTIONS - TM-10-4510-201-140037Installation cont'dFigure 2-2. Removing suction hose strainer from exhaust duct.Figure 2-3. Removing shower stand legs from exhaust duct.Figure 2-4. Suction hose assembly and shower stand risers on baseboard.Figure 2-5. Baseboard retaining brackets.Figure 2-6. Methods of positioning strainer in water source.Figure 2-7. Water pump and hose assemblies and cable connected.Figure 2-8. Hoses connected to water heater and fuel drum.Figure 2-9. Hoses connected to heater manifold.Figure 2-10. Connecting water hose assembly to shower stand adapter.Section II. MOVEMENT TO A NEW WORKSITEInstrumentsFigure 2-11A. Bath unit controls and instruments (sheet 1 of 5).Figure 2-11B. Bath unit controls and instruments (sheet 2 of 5)Figure 2-11C. Bath unit controls and instruments (sheet 3 of 5)Figure 2-11D. Bath unit controls and instruments (sheet 4 of 5)Section IV. OPERATION UNDER USUAL CONDITIONSFigure 2-12. Water pump assembly.Starting Bath UnitFigure 2-13. Water heater, left end viewSection V. OPERATION UNDER UNUSUAL CONDITIONSFire Extinguisher - TM-10-4510-201-140059Chapter 3 OPERATOR'S MAINTENANCE INSTRUCTIONSTable 3-1. Preventive Maintenance Checks and Services.Section IV. TROUBLESHOOTING - TM-10-4510-201-140063Section V. MAINTENANCE OF MISCELLANEOUS ITEMS - TM-10-4510-201-140064Figure 3-1. Suction strainerFigure 3-2. Suction hose.Section VI. MAINTENANCE OF SHOWER STAND AND WATER PUMPFigure 3-4. Shower head nozzle (used on Army models SPE 35 and SPE 35A) disassembled Water Line StrainerFigure 3-6. Water line strainer.Chapter 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONSUnpacking Bath UnitSection III. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICESTable 4-1. Preventive Maintenance Checks and Services.Section IV. TROUBLESHOOTING - TM-10-4510-201-140075PULSATING PRESSURE INDICATED ON'GAGESection V. MAINTENANCE OF MISCELLANEOUS ITEMS - TM-10-4510-201-140077Figure 4-3. Generator receptacle box with cable.Figure 4-4. Wiring diagram of generator receptacle box.BaseboardFigure 4-5. Bath unit baseboard and straps.Section VI. MAINTENANCE OF' SHOWER STAND ASSEMBLYRiserSection VII. MAINTENANCE OF WATER PUMP ASSEMBLYFigure 4-9. Strainer element, removed from water line strainer.Figure 4-10. Water pump assembly, left-side view.Figure 4-11. Water pump electrical connections.Water Pump Electric MotorFigure 4-13. Vane plate mounted on pump bracket.Figure 4-14. Water pump, disassembled.Figure 4-15. Wiring diagram for water pump.Water Pump - TM-10-4510-201-140092Figure 4-16. Circuit breaker subassembly showing wire connections.Figure 4-17. Circuit breaker subassembly cover opened to show overload heaters.Section VIII. MAINTENANCE OF WATER HEATER ASSEMBLYFigure 4-19. Schematic drawing of burner fuel system.Figure 4-20. Barrel plug and fuel hose assembliesFigure 4-21. Water heater, bottom view.Figure 4-22. Water heater control panel box and gages.Figure 4-23. Wiring diagram for water heater.Figure 4-24. Water heater skid and skid level.Figure 4-25. Boiler box cover and gasket, removal and installation.Burner AssemblyServicingFigure 4-26. Water heater, left-end view.Figure 4-27. Electrodes and holder, removed from burner assembly.Figure 4-29. Burner head removed from water heater.Figure 4-30. Burner electrode spark gap adjustment.Pressure Relief Valve Overflow Tube and ClipFigure 4-32. Water heater pressure and temperature control with cover removed.Bypass Hose Shower Stand Control and Water Blender ValvesWelded TankBath Unit Instructional PlateFigure 4-36. Water heater control panel box with cover removed.Water Heater Pressure and Temperature ControlFigure 4-37. Installation of York-Shipley pressure and temperature controlWater Heater Burner Solenoid Valve.Fuel Pump AssemblyFigure 4-38. Fuel pump and filter mounted on blower.Figure 4-39. Adjusting pressure on fuel pump.Fuel Pump Strainer and Cover Gasket.Figure 4-40. Fuel pump, strainer removed.Figure 4-41. Filter head, removing fuel filter head gasket.Figure 4-42. Blower, disassembled.Fuel Fittings and LinesBlower Shutter AssemblyInspection - TM-10-4510-201-140128CHAPTER 5 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE SUPPORTGeneral Cleaning InstructionsCHAPTER 6 REPAIR OF MISCELLANEOUS ITEMS, SHOWER STAND AND PUMP ASSEMBLY, AND WATER HEATER ASSEMBLYFigure 6-1. Fabrication details for baseboard.Section II. SHOWER STAND AND PUMP ASSEMBLYFigure 6-2. Schematic drawing of test procedures for transformer.Skid and Bail HandleFigure 6-3A. Pressure and temperature control (Used on all Army models except SPE 45) (sheet 1 of 2).Figure 6-3B. Pressure and temperature control (Used on all Army models except SPE 45) (sheet 2 of 2).Figure 6-4. Pressure and temperature controlFigure 6-5. Altitude variations graphFigure 6-6. Fuel pump, disassembled.Blower and Fuel Pump Electric MotorFigure 6-7. Water heater blower and fuel pump motor, disassembled.Electrical ConduitChapter 7 ADMINISTRATIVE STORAGEInspection and Maintenance of Equipment in StorageAppendix A REFERENCES - TM-10-4510-201-140147Appendix B MAINTENANCE ALLOCATION CHART (MAC) - TM-10-4510-201-140149 The Army Maintenance System MAC The Army Maintenance System MAC cont'dExplanation of Columns in the Tools and Test Equipment Requirements, Section IIISection II. MAINTENANCE ALLOCATION CHART FOR BATH UNIT, PORTABLE, 8-SHOWER HEADSection II. MAINTENANCE ALLOCATION CHART FOR BATH UNIT, PORTABLE, 8-SHOWER HEAD cont'd - TM-10-4510-201-140154Section II. MAINTENANCE ALLOCATION CHART FOR BATH UNIT, PORTABLE, 8-SHOWER HEAD cont'd - TM-10-4510-201-140155Section III. TOOLS AND TEST EQUIPMENT APPENDIX C BASIC ISSUE ITEMS LIST AND ITEMS TROOP INSTALLED OR AUTHORIZED LISTFederal Stock Number - TM-10-4510-201-140158TM-10-4510-201-14 - index