TM 10-4510-208-13&P
0009 00
PREPARE TEMPER FOR MOVEMENT
To prepare the TEMPER section for movement, follow the procedures outlined below. Refer to TM 10-
8340-224-13 as necessary.
Striking Procedure
1. Locate the frame section cover and the light set storage container.
2. Remove single ply floors (1) in vestibule.
3. Release tension on vestibule guy lines (2) and remove stakes (3).
4. Unlace vestibule door (4) sides from vestibule (5).
5. Untie vestibule tie tapes (6).
6. Remove steel pins (7) in vestibule footstops and frame base plates.
7. Collapse vestibule and position frames (8) against endwall.
8. Remove hitch pins (9) and complete door removal.
9. Remove frames and disassemble.
10. Open weather seal flap (10), unlace vestibule, remove and fold.
9
10
7
6
8
1
5
4
2
3
CAUTION
Use caution when closing container doors to avoid damage to lights.
11. Close the personnel double doors.
0009 00-2