TM 10-4510-209-13&P
0005 00
Unpack Latrine
NOTE
There may be no markings or labels distinguishing a CL packed with Packing Plan A or B.
The items packed in the latrine are intended to be used in common at a CL site. Inventory all
CL's supplied to the module, and then distribute the equipment as necessary.
1. Remove items stored inside CL for shipment.
2. Inventory latrine using the following packing lists.
Table 1. CL Packing Plan A.
Description of item
Quantity
Adjustable Wrench
1
Broom
1
Brush, Sanitary
1
Cable Assembly, Power, 60A, 100-Ft
2
Can, Ash and Garbage, 32-Gallon, Steel
1
CL/CLS TM 10-4510-209-13&P
1
Clean Out Plug Wrench
1
Debris Screen, Air Conditioner Duct
1
DISE/PDISE TM 916150-226-13
1
Electrical Feeder System PDISE-M100, including:
1
Cable Assembly, 50-Ft/100A
2
Electrical Feeder Center
1
Pigtail, 4-Ft/100A
1
Strap, Cable Carrying
8
Fire Extinguisher, ABC, 10-Lb
1
Ground Rod, Sect, Type III, Class B
1
Hose Assembly, Rubber, Potable Water, 1 -In X 20-Ft
2
Paddle
1
Strap Wrench
1
Tiedown Special Purpose Web
7
Trunk
1
0005 00-6