TM 10-4510-209-13&P
0072 00
Table 1. Maintenance Allocation Chart for CL/CLS Continued.
(6)
(5)
(3)
(2)
(1)
(4)
REMARKS
TOOLS AND
MAINTENANCE
COMPONENT/
GROUP
MAINTENANCE LEVEL
CODE
EQUIPMENT
FUNCTION
ASSEMBLY
NUMBER
REF CODE
DEPOT
GENERAL
UNIT
DIRECT
SUPPORT
SUPPORT
C
O
F
H
D
TEST
.5
4
020502
CONVENIENCE
REPLACE
.5
4
OUTLET
120V/120A
020503
20A TWISTLOCK
TEST
.5
4
(SUMP OUTLET)
REPLACE
.5
4
TEST
.5
4
020504
30A, 250V, 2
REPLACE
.5
4
POLE 3 WIRE
GROUNDING
(ECU OUTLET)
020505
WATER PUMP
TEST
.5
4
OUTLET
REPLACE
.5
4
0206
GROUNDING
INSPECT
.2
ROD ASSEMBLY
REPLACE
.4
020601
3 SECTION
GROUNDING
ROD
020602
SPLIT-LUG 3-0
REPLACE
.2
4
0207
POWER CABLES
INSPECT
.2
03
WATER SYSTEM
INSPECT
SERVICE
REPAIR
REPLACE
0301
FRESH-WATER
INSPECT
.2
PIPES
REPAIR
.7
2, 4
PVC PIPES
030101
INSPECT
.2
F
REPAIR
1.0
2, 4
INSPECT
BACKFLOW
.1
030102
.5
SERVICE
PREVENTION
.5
TEST
DEVICE
.5
REPLACE
0302
WASTEWATER
SERVICE
.3
.5
4
TANK
0303
3K COLLAPSIBLE
G
FABRIC TANK
0304
2-IN. BALL VALVE
INSPECT
.2
F
REPLACE
.2
0072 00-4