TM 10-3510-226-23
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY
TEST, REPLACE
INITIAL SETUP
Tools
Personnel Required
Shop Equipment, Automotive Maintenance and
Quartermaster and Chemical Equipment Repairer
Repair: Organizational Maintenance, Common
63J (1)
Materials/Parts
Equipment Condition
CBL set up
Circuit Breakers set to off
TEST
Test the Power Input Receptacle
WARNING
This equipment operates at high voltages. Use extreme caution, observe all warnings,
and follow all safety procedures. Failure to observe safety precautions may result in
injury or death to personnel.
NOTE
The procedure is identical for both the main power input receptacle and the dryer power
1. Disconnect power input cable (Figure 1, Item 1) from the receptacle (Figure 1, Item 2) on the CBL
power panel (Figure 1, Item 3).
2. Remove the CBL panel cover (Figure 1, Item 4).
3. At the rear of the power panel (Figure 2, Item 3), unscrew the retainer (Figure 2, Item 5) and pull the
receptacle (Figure 2, Item 2) out of the sleeve (Figure 2, Item 6).
4. Remove screws retaining the circuit breaker box cover (Figure 2, Item 7) (main circuit breaker panel
only).
5. Remove the circuit breaker box cover (Figure 2, Item 7) (main circuit breaker panel only).
6. Remove screws retaining the circuit breaker panel cover (Figure 2, Item 8).
7. Remove the circuit breaker panel cover (Figure 2, Item 8).