TM 10-3510-209-24
3-14. POWER DISTRIBUTION PANEL (CONT)
REMOVAL (Cont)
NOTE
Tag wires before removal.
6. Tag six ground wires (13). Remove two screws (11), two lockwashers (12),
and six ground wires from panel box (5).
7. Loosen screws (15). Tag and remove neutral wires (16) from connector
strips (17).
8. Loosen large allen-head set screw on connector block (18). Tag and remove
neutral wire (19) from connector blocks.
CAUTION
Carefully remove cable assemblies from panel box to prevent stripping insulation
from the wires.
9.
Remove nut (21) and cable assembly (22) from panel box (5). Tag and remove associated wires (9A) from panel
box (5).
10.
Remove nut (23) and cable assembly (24) from panel box (5). Tag and remove associated wires (8A) from panel
box (5).
11.
Remove nut (25) and conduit assembly (26) from panel box (5). Tag and remove associated wires (10A) from
panel box (5).
12.
Remove four screws(1A) and four lockwashers (2A). Remove connector box assembly (12A) including gasket
(3A). Tag and remove associated wires (11A) from panel box (5). Remove rubber grommet (13A) from panel box (5).
13.
Remove four screws (7A) and four lockwashers (6A) to separate connector (5A) from connector box (4A). Feed
wires (11A) through connector box (4A).
Change 1 3-49