TM 10--3510--221--10
0009 00--14
LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
ASSEMBLY AND PREPARATION FOR USE -- Continued
0009 00
ASSEMBLY AND PREPARATION FOR USE -- Continued
D. Install Railing and Awning -- Continued
9. Roll up excess tarp (14) and secure to underside of platform (8) with bungee cords (18).
10. Ensure awning extension (19) is secured to tarp supports (20) and ISO frame (4). Tighten straps (21) if
necessary.
11. Install light (22) to underside of tarp (14) as follows:
a. Position light (22) at desired location and secure with straps (23).
b. Route electrical cable (24) between tarp (14) and awning supports (9).
c. Connect electrical cable (24) at receptacle (25).