TM 10-3510-224-13&P
0012 00
0012 00-2
P
rocedure 1: Loss of Power
ARE MAIN CIRCUIT BREAKERS (#10) IN THE
LEFT AND RIGHT POWER DISTRIBUTION
PANELS) SET TO ON?
SET MAIN CIRCUIT BREAKERS (#10) IN
BOTH POWER DISTRIBUTION PANELS)
TO ON.
IS POWER SOURCE CONNECTED ?
HAVE QUALIFIED PERSONNEL (MOS 51R,
52C, 52D, OR 52G) CONNECT 100 AMP
POWER CABLE PIGTAIL END TO
INTENDED POWER SOURCE. ENSURE
100 AMP POWER SUPPLY CABLES ARE
CONNECTED TO CSSL POWER ENTRY
BOX CONNECTORS ON THE UTILITY
WALL. TURN POWER SOURCE ON.
ARE INDIVIDUAL CIRCUIT BREAKERS IN BOTH
POWER DISTRIBUTION PANELS SET TO ON ?
SET INDIVIDUAL CIRCUIT BREAKERS TO
ON. DETERMINE IF POWER IS
AVAILABLE TO APPLIANCES AND
EQUIPMENT BY ACTIVATING OPERATING
CONTROLS.
IF POWER IS NOT AVAILABLE TO OPERATE
APPLIANCES AND EQUIPMENT, NOTIFY DIRECT
SUPPORT MAINTENANCE.
NO
YES
NO
NO
YES
YES
INITIAL SETUP:
Equipment Condition
Materials/Parts
CSSL set-up, but not in operation
None
Maintenance Level
Unit