TM 10-3510-224-13&P
0031 00
DIRECT SUPPORT MAINTENANCE
CONTAINERIZED SELF SERVICE LAUNDRY (CSSL)
NSN 3510-01-485-0457
POWER DISTRIBUTION PANEL
TEST, REPLACE
INITIAL SETUP:
Equipment Condition
CSSL shut down, power connected and turned to OFF
Materials/Parts
Wiping Rags (WP 0070 00, Table 1, Item 1)
Tags, Marking (WP 0070 00 Table 1, Item 8)
Tape, elec. Ins.(WP 0070 00 Table 1, Item 13)
Tools and Special Tools
Tool Kit, Electrical Equipment (WP 0042, Table 2,
Item 3)
Personnel Required
One
WARNING
This equipment operates at high voltage. Use extreme caution during testing
procedure. Touching a live wire can cause serious injury or death. Only MOS 51R,
52C, 52D, 52G or a qualified civilian must perform this procedure.
TEST
1. Connect the100 AMP power to the power entry panel plug(s)(1) and (2). Using a multimeter set to read AC
Voltage, determine the availability of power at both power distribution panels main breakers (#10) (3).
2. Test individual breakers as necessary to isolate a malfunction.
1
2
3
3
0031 00-1