Procedure 3: External Component Power Loss
INITIAL SETUP:
Equipment Condition
CSSL set-up, but not in operation
Materials/Parts
None
Maintenance Level
Direct Support
Personnel Required
One
ARE COMPONENT OPERATING
CONTROLS PROPERLY SET OR
ADJUSTED?
SET OR ADJUST COMPONENT
CONTROLS AS NECESSARY FOR
OPERATION.
(REFER TO WORK PACKAGE 0005 00)
IS POWER AVAILABLE AT THE
COMPONENT CIRCUIT BREAKER?
USING A MULTIMETER SET TO MEASURE
AC VOLTAGE, CHECK THE AVAILABILITY
OF POWER AT THE COMPONENT
BREAKER.
(REFER TO WORK PACKAGE 0030 00)
SWITCH BREAKER TO ON POSITION AND
OPERATE COMPONENT.
(REFER TO WORK PACKAGE 0005 00)
PERFORM TROUBLESHOOTING
PROCEDURE #1: SYSTEM POWER LOSS.
CHECK POWER SUPPLY WIRING TO THE
COMPONENT FOR PHYSICAL DAMAGE.
REPLACE WIRING AS NECESSARY.
REPLACE A DEFECTIVE COMPONENT AS
DESCRIBED IN CHAPTER 6.
NO
YES
IS POWER AVAILABLE AT MAIN
BREAKER?
USING A MULTIMETER SET TO MEASURE
AC VOLTAGE, CHECK THE AVAILABILITY
OF POWER AT THE MAIN BREAKER.
(REFER TO WORK PACKAGE 0030 00)
YES
YES
NO
NO
END OF WORK PACKAGE