TM 10-3510-226-23
0001 00
DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE
Destruction of Army materiel to prevent enemy use shall be in accordance with TM 750-244-3.
PREPARATION FOR STORAGE OR SHIPMENT
Before placing the CBL in administrative storage or preparing the system for shipment, current
maintenance services must be applied; defects and failures corrected; and Modification Work Orders
(MWO's) applied. Prepare the system for storage and shipment as described in Chapter 2 of TM 10-
3510-226-10.
Placement of Equipment in Storage
Equipment should be placed in storage for limited periods only, when a shortage of maintenance
capability exists. Items should be mission ready within 24 hours, or within time factors set by directing
authority. During storage periods, maintenance records must be kept current.
Storage Site Selection
Covered space is preferred. When sufficient covered space is not available, priority should be given to
items that are most susceptible to deterioration from the elements. Open sites should be improved
hardstand, if available. Unimproved sites should be firm, well-drained locations, free of excessive
vegetation.
WARRANTY INFORMATION
No warranty.
NOMENCLATURE CROSS-REFERENCE LIST
The following lists cross-reference common names used throughout this manual to official nomenclature.
COMMON NAME
OFFICIAL NOMENCLATURE
Analog Input Module
Computer Subassembly
Analog Output Module
Computer Subassembly
Antifreeze
Glycol
Heater 12000 BTU Port
Army Space Heater
Bootwall
Modified TEMPER endwall
Breaker Box
Main Breaker Panel
CBL
Containerized Batch Laundry
Electric Box Heater
FDECU
Field Deployable Environmental Control Unit
Nanofilter Canister
Filter Unit, Water Purification
Phase Indicator
Light, Indicator
PLC
Programmable Logic Controller
QD, QDC
Quick Disconnect Coupling
Sump Pump
Pump, Submersible
TEMPER
Tent, Extendable, Modular, Personnel
Thermistor
Resister, Thermal
Tube
Lamp, Fluorescent
WTS
Water Treatment System
Change 1