TM 10-3510-226-23
0003 00
THEORY OF OPERATION-CONTINUED
Graywater System
Overflow from the WTS holding tank, nanofilter tank, and recycle tank is discharged through PVC piping
to the waste tank (Figure 6, Item 1) located beside washer No. 1. A sump pump in the waste tank pumps
the graywater into a 3,000-gallon fabric water bag set up outside the CBL or an approved waste water
system.
1
Figure 6. Graywater System.
0003 00-6