TM 10-3510-226-23
0031 00
REPLACE-CONTINUED
Replace Copper/Brass Pipe Fittings
WARNING
Ensure graywater pipes have been sanitized IAW procedures contained in TB MED 577
before attempting any repairs. Failure to observe safety precautions may result in
serious illness or death from biohazards.
NOTE
The following procedure applies only to threaded pipe nipples and fittings.
1. Flush and drain Water Treatment System IAW procedures given in TM 10-3510-226-10.
2. Place CBL out of service and disconnect power.
3. Use a pipe wrench to steady attached plumbing, and unscrew nipple (Figure 6, Item 12) or fitting
(Figure 6, Item 13) to be replaced.
4. Apply pipe sealing compound to threads of replacement nipple (Figure 6, Item 12) or fitting (Figure
6, Item 13).
5. Use a pipe wrench to steady attached plumbing, and install replacement nipple (Figure 6, Item 12) or
fitting (Figure 6, Item 13).
6. Ensure replacement nipple or fitting is tight.
7. Operate CBL IAW procedures given in TM 10-3510-226-10 and monitor for leakage and normal
operation.
13
12
Figure 6. Replace Copper/Brass Pipe Fittings.
0031 00-10