TM 10-3510-226-23
0031 00
REPLACE-CONTINUED
Replace Internal Hoses
WARNING
Ensure graywater pipes have been sanitized IAW procedures contained in TB MED 577
before attempting any repairs. Failure to observe safety precautions may result in
serious illness or death from biohazards.
1. Flush and drain Water Treatment System IAW procedures given in TM 10-3510-226-10.
2. Place CBL out of service and disconnect power.
3. Loosen and remove hose clamps (Figure 9, Item 17) retaining damaged hose (Figure 9, Item 18).
4. Remove hose (Figure 9, Item 18).
5. Cut replacement hose (Figure 9, Item 18) to same length as damaged hose.
6. Install replacement hose (Figure 9, Item 18), and retain with hose clamps (Figure 9, Item 17).
7. Operate CBL IAW procedures given in TM 10-3510-226-10 and monitor for leakage and normal
operation.
17
18
Figure 9. Replace Internal Hoses.
END OF WORK PACKAGE
0031 00-15/(16 Blank)