TM 10-3510-226-23
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY
CONTROLS, BURNER, AND BURNER
REPLACE
INITIAL SETUP
Tools
Personnel Required
Quartermaster and Chemical Equipment
Table 2, Item 6)
Repairer 63J (2)
Materials/Parts
Equipment Condition
CBL set up
References
TM 10-3510-226-10
Item 50)
REPLACE
Replace the Burner Motor
WARNING
Ensure that all electrical power to the boiler is shut off and disconnected before
proceeding. The circuit breaker box or individual circuit breaker should be locked and
tagged out by personnel following this procedure. Remember that the CBL is a wet
environment. Serious injury or death to personnel can result from electrocution if proper
safety precautions are not observed.
WARNING
Ensure fuel is contained and not allowed to spill or spray into the CBL. Failure to observe
safety precautions may result in a fire, with the possibility of serious injury or death to
personnel.
WARNING
Allow the boiler and any associated hot water pipe, tubing or fixtures to cool at least 30
minutes before attempting any repairs. Failure to observe safety precautions may result
in serious injury or death to personnel.
1. Disconnect power by switching circuit breaker No. 22 to OFF.
2. Remove screw retaining burner primary control (Figure 1, Item 1), and remove burner primary
control.
3. Tag and disconnect motor wiring at connections (Figure 1, Item 2).
4. Remove the screws retaining the motor (Figure 2, Item 3) to the burner (Figure 2, Item 4), and
replacement remove the motor.