TM 10-3510-226-23
0079 00
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY
EQUIPMENT, COLD WEATHER
TEST, REPLACE
INITIAL SETUP
Tools
Personnel Required
Tool Kit, General Mechanics: Automotive (WP
Quartermaster and Chemical Equipment Repairer 63J
(1)
Materials/Parts
Equipment Condition
None Required
CBL set up
TEST
Test the Extension Cords
WARNING
Ensure that all electrical power is shut off and disconnected before proceeding. The
circuit breaker box or individual circuit breaker should be locked and tagged out by
personnel following this procedure. Remember that the CBL is a wet environment.
Serious injury or death to personnel can result from electrocution if proper safety
precautions are not observed.
1. Disconnect extension cord (Figure 1, Item 1).
2. Place extension cord ends next to each other.
4. Each prong should have continuity with one socket.
5. Replace an open or shorted extension cord (Figure 1, Item 1).
1
Figure 1. Test the Extension Cords.