TM 10-3530-207-14
4-40. DARNING SEWING MACHINE FOOT PEDAL MAINTENANCE.
This task consists of:
a.
Removal
b.
Inspection
c.
Repair
d.
Installation
INITIAL SET-UP:
Tools:
General Mechanics Tool Kit (Appendix B,
Item 1)
Equipment Condition:
Power Removed (para. 2-18)
Removal. Refer to paragraph 2-18
Inspection.
(1) Inspect for cracked or damaged parts
(2) Inspect for lost or missing clamps.
Repair. Repair is limited to replacement of the defective components.
Installation. Refer to paragraph 2-8.
4-92