TM 10-3530-207-14
4-44. DARNING SEWING MACHINE TREADLE PIPE MAINTENANCE . I
This task consists of:
a. Removal
b. Cleaning
c. Inspection
d. Repair
e. Installation
INITIAL SET-UP:
Tools:
Materials/Parts:
General Mechanics Tool Kit (Appendix B,
Rag, wiping (Appendix F, Item 2)
Item 1)
Adhesive (Appendix F, Item 12)
Equipment Condition:
Power removed (para. 2-18)
Removal. Refer to paragraph 2-18
Cleaning.
(1) Clean the pipe treadle with a clean damp wiping rag (Appendix F, Item 2).
(2) Allow to dry.
Inspection.
(1) Inspect for damaged parts.
(2) Inspect for missing or cracked clamps.
(3) Inspect for loose or missing cork.
Repair. Repair is limited to the
following:
Replace damaged or missing
cork.
(2) Remove old cork (1) from
pipe treadle (2).
(3) Using adhesive (Appendix F,
Item 12, replace the cork
(1) on the pipe treadle (2).
Installation. Refer to paragraph 2-8.
4-97