TM 10-3530-207-14
SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
4-65. SECURITY PROCEDURES.
Refer to AR 190-11 or AR 190-13.
4-66. ADMINISTRATIVE STORAGE.
a.
Placement of equipment in administrative storage should be for short periods of time when a
shortage of maintenance effort exists. Items should be mission ready within 24 hours or within the
time factors as determined by the directing authority. During the shortage period, appropriate
maintenance records will be kept.
b.
Before placing equipment in administrative storage, current maintenance services and Preventive
Maintenance Checks and Services (PMCS) evaluations shouldbe completed, shortcomings and
deficiencies should be corrected, and all modification work orders (MWOs) should be applied
.
c.
If clothing repair shop was used in a salt air environment, wash exterior with detergent and fresh
water. Rinse with clean water and allow to dry.
d.
Storage Site Section. Inside storage is preferred for items selected for administrative storage. If
inside storage is not available, keep clothing repair shop away from the corrosive materials, such as
saltwater spray.
4-164