TM 10-3530-207-14
5-13. GENERATOR SUPPORT RAIL MAINTENANCE.
This task covers:
a.
Installed Item Inspection
b.
Removal
c.
Cleaning
d.
Inspection
e.
Repair
f.
Installation
INITIAL SETUP :
Tools:
Equipment Condition :
General Mechanics Tool Kit (Appendix 13,
Tailgate lowered (para 2-8).
Item 1)
Generator removed (para 2-8.)
Riveting Tool Set (Appendix 13, Item 4)
Material:
Detergent, General Purpose (Appendix F, Item 11)
Rivet
Installed Item Inspection.
(1)
Inspect for loose or missing
hardware.
(2)
Inspect for cracks, broken
parts, rust and corrosion.
Removal.
(1)
Disconnect two pins (1)
and remove generator clamp (2).
(2)
Remove six screws (3) on
each track (4).
(3)
Remove both tracks.(4)
Cleaning.
(1)
Wash the generator track and holddown assembly with a solution of detergent (Appendix
F, Item 11) and water.
(2)
Rinse thoroughly with clean water.
(3)
Allow to dry.
Inspection.
(1)
Inspect for missing or damaged hardware.
5-23