TM 10-4510-208-13&P
0005 00
Install Single Ply Floor
CAUTION
Clear and level ground before installing floor. Sharp objects or depressions can damage
tent floor.
1. Identify single ply floor sections (1). The Containerized Shower utilizes two 8-foot floor sections.
2. Unroll floor sections and install black side down. Place all floor sections alternating hook and pile
fasteners (2,3).
3. Secure tie tapes (4) on narrow edge of floor to base purlins (5) on raised side of tent.
1
2
3
4
5
0005 00-30