TM 10-4510-208-13&P
OPERATOR MAINTENANCE
CONTAINERIZED SHOWER
SHOWER, ENCLOSED UNIT, SYSTEM
PLUMBING
INSPECT, REPLACE
INITIAL SETUP
Tools
Personnel Required
One
Materials/Parts
Equipment Condition
Containerized Shower / Shower, Enclosed Unit,
System set up.
INSPECT
Inspect Shower Plumbing
1. Inspect the shutoff valves (1), soldered fittings (2), and unions (3) on external and internal
piping for physical damage, corrosion or leaking.
2. Inspect the connecting hoses (4) for physical damage such as cuts, abrasions, or bulging.
(late production Containerized Shower only).
3
1
2
1
4
Late Production Containerized Shower Only
0026 00-1