TM 10-4510-209-13&P
OPERATOR'S, UNIT, AND DIRECT SUPPORT MAINTENANCE
CONTAINERIZED LATRINE (CL)
OPERATION UNDER USUAL CONDITIONS PREPARATION FOR MOVEMENT
GENERAL
This work package contains the procedures to prepare the CL (Force Provider configuration) for
movement.
Read all warnings, cautions, and notes within this section and follow procedures outlined herein to ensure
safe operation of the latrine and associated equipment.
Familiarize yourself with the location of the 60A main circuit breaker on the power distribution panel before
operating the latrine.
0007 00-1