TM 10-4510-209-13&P
0021 00
26. Install and tighten splice connector nut (15) until grounding cable (5) is securely fastened to
grounding stud (4) using adjustable wrench provided.
27. Tighten washer(s) (14) and nut(s) (13) securely.
28. Reconnect 60A pigtail cable (1) to power entry panel (2).
29. Reconnect main power supply, and operate CL/CLS IAW operating procedures given in WP 0006 00
(CL) or 0009 00 (CLS).
7
6
5
9
12
11
8
10
3
15
0021 00-3