TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
ELECTRICAL SYSTEM
TEST, REPLACE
INITIAL SETUP
Tools
Personnel Required
52C
Materials/Parts
Equipment Condition
Disconnect power from CL/CLS.
Set all circuit breakers and switches to OFF
position.
TEST
Test Toggle Switch
WARNING
Always secure and tag circuit breakers in the OFF position or disconnect equipment's
power cord from receptacle before attempting any electrical repairs, even minor repairs
(or tests) such as replacing a light bulb. Remember that the latrine is a wet environment
capable of posing an electrical shock hazard when personnel have direct contact with
energized wires or metal parts. Failure to observe this safety warning may result in
serious injury or death to personnel.
1. Open circuit breaker panel door (1).
2. Ensure all circuit breakers (2) and switches are set to the OFF position.
3. Remove four captive screws (3) securing circuit breaker panel cover (4) to breaker box (5), and
remove circuit breaker panel cover.
4. Tag and disconnect wiring (6) from toggle switch (7).
5. Using a multimeter set to read ohms, check for continuity at toggle switch (7) with switch set to the
ON position. If no continuity exists, replace toggle switch.
6. Using a multimeter set to read ohms, check for continuity at toggle switch (7) with switch set to the
OFF position. If continuity exists, replace toggle switch.
7. Using a multimeter set to read ohms, check for continuity at toggle switch (7) between each pole (8)
and the switch case. If continuity exists, replace toggle switch.
8. Install circuit breaker panel cover (4) onto breaker box (5), and retain with four captive screws (3).
0044 00-1