TM 1-4220-250-12&P
Table 4-1. PMCS. (Continued)
Item
No.
3
interval
Initial/360±
Days
Item To Be
Checked Or
Serviced
Inflation
Assembly
Procedure
Inspect the inflation assembly as follows:
a. Remove and discard ordnance tape.
Loosen set screw and remove CO2 cylin
der from valve assembly.
NOTE
Do not discard set screw.
b. Examine inflation device, actuating lever
and lanyard for fraying, corrosion,
stripped threads,
and other damage.
c. If required, remove any sharp edges from
valve with a tine round file.
d.
Operate beaded inflation handle three or
four times. Ensure that lever moves freely
and ensure that piercing pin moves prop
erly inside valve body.
NOTE
Each time inflation assembly gaskets or
inflation assembly is removed and replaced
for any reason, a functional test shall be
conducted. Use new gaskets when replac-
ing device.
e. If any discrepancy is noted in a device
that is not repairable in accordance with
paragraph 4.8.4, remove the assembly and
install a new inflation device.
Not Fully Mission
Capable If:
If any discrepancy is
noted, remove from
service and repair or
replace IAW proce-
dures in this chapter.
Change 1 4-5