TM 10-3510-208-12
c. Cleaning. Clean all parts of the air pressure
control switch assembly, with a clean cloth to
remove oil, grease or other matter and dry
thoroughly.
d. Inspection and Repair.
(1) Inspect the hoses for cracks, holes, pitting
and other leak causing conditions. Replace as
necessary.
(2) Inspect the air pressure control switch for
cracks, dents, nicks and other damage. Replace as
necessary.
(3) Inspect the hose connectors and all hard-
ware for thread damage. Replace as necessary.
(4) Replace a damaged air pressure control
switch.
e. Assembly.
(1) Install the connectors (4 and 3, figure
4-67) in air pressure control switch (5).
(2) Install hoses (2 and 1).
f. lnstallation.
secure with screws (2).
(2) Reconnect the lines (1).
TS 10-3510-208-12/4-67
1. Hose
4. Connector
2. Hose
5. Switch
3. Connector
Figure 4-67. Air pressure control switch,
disassembly and reassembly.
Section XIX. TUMBLER CONTROL PANEL AND RELATED PARTS
4-52. Control Panel and Related Parts
(10) securing the control panel assembly (11) to the
a. Removal.
dryer-tumbler.
Remove the screws (1, fig. 4-68), and
(1)
(5) Remove locknuts (12) and remove the
keepers (13).
cover (3) to the dryer-tumbler.
(6) Remove the screws (14) and lockwashers
(2) Tag and disconnect all wiring from the
(15) securing the switch box cover (16).
control panel assembly, timer and relay contact
(7) Remove nuts (17), Iockwashers (18) and
sets.
screws (19) and remove the relay switch assemblies
(3) Remove the nuts (4), screws (5) and
(20) from the dryer-tumbler.
spacers (6) and keeper (7) securing the timer (8) to
the dryer-tumbler.
4-91