TM 10-3510-222-24
3-73. HEATER.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools
General Mechanics Tool Kit (App B, Item 1)
Heat Exchanger Installation Kit (App B, Item 5)
Materials /Parts
Rope Gasket (App C, Item 48)
Rope Gasket (App C, Item 49)
Rope Gasket (App C, Item 52)
Rope Gasket (App C, Item 53)
Rope Gasket (App C, Item 54)
Rope Gasket (App C, Item 55)
Personnel Required
Four
Equipment Condition
Laundry Unit shut down (TM 10-3510-222-10)
Beams and baskets removed (Para 2-13 to 2-17)
Screen removed (Para 3-75)
Blower and burner assembly removed (Para
3-70)
General Safety Instructions
WARNING
Heater assembly may be hot if dryer was running.
To prevent burns allow sufficient time for heater to
cool before replacement.
a.
REMOVAL
(1)
Remove twenty screws (1), lockwashers (2) and rear cover (3).
(2)
Remove nineteen screws (4), lockwashers (5) and front cover (6).
(3)
Remove six screws (7), lockwashers (8) and ground strap (21).
(4)
Remove four screws (9), lockwashers (10), flat washers (11) and plate (12).
(5)
Remove two nuts (13), screws (14) and lockwashers (15).
(6)
Remove two screws (16), lockwashers (17) and flat washers (18).
WARNING
Heater assembly is heavy and requires four people to remove. Attempts to lift alone may cause
injury.
(7)
Remove cover (19) from rear of dryer.
(8)
Remove heater assembly (20) from top of dryer.
3-169