TM 10-3510-224-13&P
0005 00
PREPARE WASTEWATER COMPONENTS FOR SHIPMENT.
WARNING
Avoid spillage of wastewater during preparation for movement. Drain wastewater
hoses into an approved disposal facility. Keep wastewater hoses separate from
freshwater hoses.
Using a municipal disposal system:
1. After the sump pump (1) has stopped running, shut off the pump (Circuit Breaker #12, Right Side Power
Distribution Panel).
2. Disconnect the 2 wastewater hose (2) from the wastewater panel (3) on the utility wall, and drain it into the
disposal connection. Disconnect 2 wastewater hose (2) from wastewater disposal point. Drain the hose, coil and set it
aside. Install dust cap (4) on panel (3).
Using a 3,000 Gallon wastewater collection tank:
1. Disconnect the 2 wastewater hose (2) from the wastewater panel (3) on the utility wall. While holding the end of
the hose (2) above the water level in the 3,000 Gallon wastewater tank (5), place the end of the hose into the
wastewater tank (5). Install dust cap (4) on panel (3).
WARNING
The 3,000 Gallon water tank is heavy. To avoid injuries, four persons are required to
prepare the CSSL for shipment.
2. Empty the 3,000 Gallon wastewater tank (5) in accordance with TM 10-5430-237-12&P. Remove the 2
wastewater hose (2) from the wastewater tank. Drain the hose, coil it and set it aside.
3. Disassemble and place 3,000 Gallon wastewater tank (5) into its cover in accordance with TM 10-5430-237-12&P.
0005 00-44