TM 10-3510-226-23
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY (CBL)
COOLANT, RESERVOIR
REPLACE
INITIAL SETUP
Tools
Personnel Required
Tool Kit, General Mechanics: Automotive
Quartermaster and Chemical Equipment Repairer
63J (1)
Materials/Parts
Equipment Condition
CBL set up
References
TM 10-3510-226-10
REPLACE
Replace the Coolant Reservoir
WARNING
Allow the boiler and any associated hot water pipe, tubing or fixtures to cool at least 30
minutes before attempting any repairs. Failure to observe safety precautions may result
in serious injury or death to personnel.
NOTE
Replacement of this component may be easier if washer No. 1 is removed.
1. Disconnect the power.
2. Remove the screws retaining the coolant reservoir mount (Figure 1, Item 1) and remove the coolant
reservoir mount.
3. Loosen the clamp retaining the hose to the coolant reservoir (Figure 1, Item 2) and remove the
coolant reservoir.
4. If necessary, drain the coolant reservoir (Figure 1, Item 2).
5. Install the replacement coolant reservoir (Figure 1, Item 2) onto the hose and retain with clamp.
6. Install the coolant reservoir (Figure 1, Item 2) in place atop the boiler and secure in place with the
coolant reservoir mount (Figure 1, Item 1).
7. Retain the coolant reservoir mount (Figure 1, Item 1) with screws.
Change 1