TM 10-3510-226-23
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY (CBL)
PUMP, CIRCULATION
TEST, REPLACE
INITIAL SETUP
Tools
Personnel Required
Tool Kit, General Mechanics: Automotive (WP 0086
Quartermaster and Chemical Equipment
Repairer 63J (1)
Materials/Parts
Equipment Condition
CBL set up
Item 14)
References
Tape, Electrical Insulation, -inch Width
TM 10-3510-226-10
TEST
Test the Circulation Pump Motor
WARNING
Ensure that all electrical power to the boiler is shut off and disconnected before
proceeding. The circuit breaker box or individual circuit breaker should be locked and
tagged out by personnel following this procedure. Remember that the CBL is a wet
environment. Serious injury or death to personnel can result from electrocution if proper
safety precautions are not observed.
WARNING
Allow the boiler and any associated hot water pipe, tubing or fixtures to cool at least 30
minutes before attempting any repairs. Failure to observe safety precautions may result
in serious injury or death to personnel.
NOTE
Replacement of this component may be easier if washer No. 1 is removed.
1. Disconnect power by switching the circuit breaker No. 22 to off.
2. Remove screws retaining junction box cover (Figure 1, Item 1) and remove cover.
3. Tag and disconnect wiring.
Change 1
0074 00-1