TM 10-4510-201-14
(sheet 5 of 5).
Section IV. OPERATION UNDER USUAL CONDITIONS
2-9. Preparation of Bath Unit for Operation
Before starting the bath unit, perform the preliminary
a. The instructions in this section are for the
inspections prescribed in the daily preventive
information and guidance of personnel responsible for
operation of the bath unit.
following steps to prepare the bath unit for operation:
b. The operator must know how to perform every
a.
Check the generator fuel tank and the water
operation of which the bath unit is capable. This section
heater fuel drum for adequate fuel.
contains instructions on starting and stopping the bath
b. Make certain the two power cord cables, the
unit and on operation of the bath unit.