1 Coupling
4-36. Bypass Hose
2 Wires
a. Inspection. Inspect for deteriorated and cracked
3 Conduit, offset
4 Locknut, electrical
b. Removal.
5 Base, mounting
6 Bleed assembly
(1) Loosen the hose clamp that holds the
7 Tee, pipe
bypass hose to the water blender valve.
(2) Loosen the clamp that holds the hose to the
A. York-Shipley Control Installed
lower water manifold.
1
Tube, overflow
(3) Remove the hose from the heater.
2
Clip
3
Bleed assembly
c. Installation.
Replace defective hose with a
4
Screw, mounting
serviceable one. Fabricate a serviceable hose from the
5
Screws, wire terminal
bulk hose the same length as the defective one. Install
6
Locknut, pipe nipple
serviceable hose by reversing the procedure in b above.
7
B. Penn Control Installed