TM 10-4510-208-13&P
OPERATOR MAINTENANCE
CONTAINERIZED SHOWER
FRESH WATER PUMP ASSEMBLY
INSPECT
INITIAL SETUP
Tools
Personnel Required
One
Materials/Parts
Equipment Condition
Containerized Shower set up.
INSPECT
Inspect the Pump Assembly
1. Inspect the pump frame (1) for cracks, dents, and broken tubing and welds.
2. Inspect the pump pressure tank (2) for leaking air or water. Ensure the pressure tank is securely
mounted in the frame.
3. Inspect the pump pressure switch (3) for material damage or missing cover.
4. Inspect the motor starter and overload relay assembly (4) for material damage. Ensure secure
mounting.
5. Inspect the fresh water pump (5) for material damage, secure mount in frame, and leaks.
6. Inspect the pump pressure gauge (6) for material damage or leaks. Pressure gauge should not have
water in face, and scale should be legible.
6
3
4
1
2
5
0030 00-1